地鐵車站斜井爆破開挖對側(cè)穿建筑物穩(wěn)定性的影響分析

打開文本圖片集
中圖分類號:U455.6 文獻標志碼:A 文章編號:2095-2945(2025)19-0056-04
Abstract:During theblastingandexcavationofsubwaytunnels,adjacentbuildingswillbefrequentlydisturbedbyblasting vibrationwaves.Whenthisdisturbanceexcedsacertainthreshold,thebuildingwillbedamaged.Basedontheblasting excavationoftheinclinedshaftatZhenjiangRoad StationofQingdaoMetroLine5,andbasedonthenumericalanalysismethod ofthefiniteelementsoftwareLS-DYA,theblastingexcavationprocessoftheinclinedshaftcyclefotageissimulatedandthe impactofblastingexcavationonthestabilityofside-penetratingbuildingsisanalyzed.Theresultsshowthatthemaximum vibrationvelocityofbuildingpilesisgreaterthanthemaximumvibrationvelocityofplatesandcolumnsateverymoment,and themaximumvaluesofvibrationveloities ineachdirectionandcombinedvibrationvelocitiesarelowerthantherequirementsof thespecification;thevibrationvelocityintheexcavationdirectionismostobviouslyafectedbytheblastcenterdistaneandis thelargestamongthepeakvibrationvelocitiesineachdirection;the"voidffect"onlysignificantlyamplifiestheblasting vibrationvelocitywithinacertaindistanceafterexcavation;duringon-sitemonitoringatentionshouldbepaidtothepositionof thepiletopandplateedge.Theresearchresultscanprovidereferenceforfuturesafetyasesmentofbuildingsadjacentto subway tunnel blasting construction.
Keywords: vibration effects; LS-DYNA; inclined tunnel; cyclic footage;side-penetrating buildings
在進行地鐵隧道的爆破施工時,由于炸藥能量的瞬時釋放,其所產(chǎn)生的巨大沖擊力將穿透周邊的巖石層,并對鄰近的建筑物造成巨大的振動擾動,一旦這種擾動大于一定的閾值,就可能導(dǎo)致建筑的坍塌和損毀。(剩余3924字)