特黄三级爱爱视频|国产1区2区强奸|舌L子伦熟妇aV|日韩美腿激情一区|6月丁香综合久久|一级毛片免费试看|在线黄色电影免费|国产主播自拍一区|99精品热爱视频|亚洲黄色先锋一区

倒塔作業(yè)桿塔與周邊建筑物實(shí)時(shí)動(dòng)態(tài)碰撞風(fēng)險(xiǎn)仿真分析

  • 打印
  • 收藏
收藏成功


打開(kāi)文本圖片集

中圖分類號(hào):TP391.9;TQ178 文獻(xiàn)標(biāo)志碼:A文章編號(hào):1001-5922(2025)07-0175-04

Abstract: By adjusting the mechanical parameters,the collsion analysis between the tower and the surrounding buildings in the tower collapse operation iscompleted,butthe propertiesof the nonlinear elementsareignored,resulting in poor analysis results.In thisregard,areal-time dynamiccolision risk simulation analysis between the tower and the surrounding buildings in the tower collapse operation was proposed. Combined with the mass matrix and displacement matrix,the dynamic modeling of thenonlinear structure was carriedout,and the finite elastic element was introduced to characterize the nonlinear structural properties.Combined with the linear correlation between collisionriskand quantification results,two risk indicators of congestionandproximitywere constructed.Thecollision risk value was solvedby grading thecollsion risk index and mapping it to five diffrent warning levels.The experimental results showed thatthe ideal fiting coeficient of the analysis results was high and the analysis accuracy was relatively good when the real - time dynamic collision risk was simulated and analyzed.

Key words:inverted operational tower;building;collision risk;simulation analysis

在城市地區(qū),由于土地資源的緊缺和建筑物密集,桿塔與周邊建筑物的安全距離往往受到限制。(剩余5804字)

目錄
monitor