盾構(gòu)隧道穿越巖溶區(qū)注槳加固對地層及管片的影響

打開文本圖片集
Abstract:TheXiaoshui shieldtunelingsectionoftheGuangxi branch linealong the Xinjiangcoal-to-gaspipelineforexternal transmission,locatedinthekarst-developedregionofYongzhou City,HunanProvince,employsslurrybalanceshieldtuneling technologytotraversestronglydevelopedarststrata(karstandform).Byfocusingonfourheterogeneouskarstcaves(fulfilled, partillyileandfild)istrbutedoundtuel,dimensioalfuddoupligumercalodelwaabld basedontheZK1ltypicalcross-section.Theinflunce mechanismsof thespatialdistributionofkarstcavesonsuroundingrock stabilityandteefectivensofgoutingeinforementweresystematicallyinvestigatedResultsindicatetatinuntreatedsenaios, theplasticzosofrckslbsetwenas1/andtheteloeintercoted,adngtoiumselemenof0.49m anda peak segment stress of1.76 MPa.Aftercement mortarreinforcement,te maximum ground settlementdecreases by 22.4%(0.38mm ) segment stress reduces by 4.6%\~8.2 % ,and plastic zone volume diminishes by 58.7% . The findings reveal the progressive failure mechanismofsuroundingrockinkarst shieldtunnelsand proposeatreatmentthresholdforkarstcaves basedonplasticzone conectivitycriteria.Thisresearchprovidesafluid-solidcouplinganalysismethodandprocessoptimizationframewrkforriskontrol in the Xiaoshui Tunnel and similar engineering projects.
Keywords:shieldtunnel; karststrata;numericalsimulation;suroundingrockinstability;plasticzone;groutingreinforcement
在我國巖溶發(fā)育地區(qū),盾構(gòu)隧道工程建設(shè)常面臨復(fù)雜地質(zhì)挑戰(zhàn)。(剩余7758字)