部分斜拉橋分絲型鞍座抗滑錨固研究

打開文本圖片集
中圖分類號:U448.27 文獻標志碼:A 文章編號:2095-2945(2025)18-0075-05
Abstract:Theanti-slidinganchoragesysteminthesaddlesystemofsomecable-stayedbridgesisa wiretypestructure, withaspanof (85.23+5x125+85.23)mprestressedconcretetwin-towerandsingle-cable-planepartialcablestayedbridgeisused astheengineringbackground.Teanti-slidingprincipleoftheanti-slidinganchoragesysteminthesaddleareaofthebridgeis analyzed,andtheanti-slidinganchoragegriptheoryofthesplit-wirecablesadleissummarized.Calculationmethod,anti slidinganchorageloadtestiscarredout,andtheultimateunbalancedforceverificationissimulatedthroughactualworking conditions,whichprovidestechnicalsupportforthereliabilityoftheanti-slidinganchoragesystemandlaysafoundatinforthe structural design of similar types of bridges.
Keywords:partial cable-stayed bridge; split-wire saddle;anti-sliding anchorage;ultimate load; model test
部分斜拉橋轉(zhuǎn)向鞍座抗滑體系是一種定向由主梁傳遞到主塔兩側(cè)拉索拉力的結(jié)構(gòu),通過設(shè)置在鞍座兩側(cè)的抗滑錨固裝置實現(xiàn)對鋼絞線拉索的握裹和附著力,達到主塔兩側(cè)平衡拉索拉力。(剩余6554字)