船舶電站系泊試驗(yàn)電能回饋船廠電網(wǎng)探討

打開文本圖片集
摘 要:本文介紹了新造船舶系泊試驗(yàn)過程中,被測(cè)試船舶電站發(fā)出的電能回饋到船廠電網(wǎng)進(jìn)行回收利用的初步可行性分析。該解決方案,有助于節(jié)能減排,創(chuàng)造良好的船廠和社會(huì)的經(jīng)濟(jì)、生態(tài)效益。
關(guān)鍵詞:系泊試驗(yàn);船舶電站;電能回饋;回收利用;節(jié)能減排
中圖分類號(hào):U671.99 文獻(xiàn)標(biāo)志碼:A
Preliminary Study on Electric Power Feeding-back to Shipyard Electric Grid during the Mooring Test of Ship Power Station
SHU Zhongwang
( Guangzhou Marine Technology Co., Ltd., Guangzhou 511458, China )
Abstract: This paper presents a preliminary feasibility analysis of feeding back the electric energy emitted from the tested ship's power station to the shipyard electric grid for recycling and utilization during the mooring test of a newly-built ship. This solution helps to save energy, reduces emissions, and creates good economic and ecological benefits for the shipyard and the society.
Key words: mooring test; ship power station; electric power feeding back; recycling and utilization; energy conservation and emission reduction
1 引言
截至2022年6月底,全球手持新造船訂單量為3590艘,中國(guó)前50名船廠手持訂單量為1 519艘,該統(tǒng)計(jì)口徑,主要是貨物運(yùn)輸類商船,尚未覆蓋各類艦船、公務(wù)執(zhí)法船以及部分工程類船舶。(剩余4311字)