特黄三级爱爱视频|国产1区2区强奸|舌L子伦熟妇aV|日韩美腿激情一区|6月丁香综合久久|一级毛片免费试看|在线黄色电影免费|国产主播自拍一区|99精品热爱视频|亚洲黄色先锋一区

香山隧道新近系富水弱膠結(jié)砂巖地層深井降水研究

  • 打印
  • 收藏
收藏成功


打開文本圖片集

關(guān)鍵詞:富水弱膠結(jié)砂巖;隧道;地表深井降水;周邊注漿加固中圖分類號: ;U455.49 文獻(xiàn)標(biāo)志碼:A文章編號:1001-5922(2025)05-0167-04

Abstract:Based on the Xiangshan Tunnel Project,the influence of surface deep well precipitation on the groundwaterlevelaroundthe tunnel was studiedandanalyzedbyusing the methodof numericalsimulationand fieldtest,and theeffect and applicabilityof precipitation were tested.The resultsshowed that when thesurface ultra-deep well precipitation was used,the groundwater level decreased significantlyinthe first5O days,decreased slightly in the 50~90 days,reacheda stablelevel onthe9Othday,and decreased to 2~7 mbelow the vault.When the surrounding rock of the tunnel was reinforced by peripheral grouting,the water blocking effect was obvious,which can effectively reduce the head pressure around the tunnel,significantly change the characteristics of the surrounding rock, and improve the bearing capacity of the surrounding rock.Combined with the surface ultra-deep well precipitation andthe grouting reinforcement measures around the tunnel,the water content of the water-rich sandstone formation canbe effectively reduced to about 10%. In order to ensure the safety of water-rich sandstone tunnel construction, the maximum water output capacityof the dewatering well should be considered before tunnel excavation and an economical and reasonable pre-pumping time should be selected.

Key words :water-rich sandstone tunnel ; surface deep well precipitation ; peripheral grouting

在富水砂巖隧道施工中,圍巖遇水易軟化、滑塌及塑性擠出。(剩余5123字)

目錄
monitor