特黄三级爱爱视频|国产1区2区强奸|舌L子伦熟妇aV|日韩美腿激情一区|6月丁香综合久久|一级毛片免费试看|在线黄色电影免费|国产主播自拍一区|99精品热爱视频|亚洲黄色先锋一区

小水電調(diào)控風(fēng)電功率波動(dòng)的虛擬電廠構(gòu)建方案研究

  • 打印
  • 收藏
收藏成功


打開(kāi)文本圖片集

關(guān)鍵詞:小水電;虛擬電廠;風(fēng)電波動(dòng)中圖分類(lèi)號(hào):TM732 文獻(xiàn)標(biāo)志碼:ADOI:10.19968/j.cnki.hnkj.1003-5168.2025.12.002文章編號(hào):1003-5168(2025)12-0010-05

Research on the Construction Scheme of Virtual Power Plantsfor Regulating Wind Power Fluctuations using Small Hydropower

LIU Weicheng ZHANG HuanYANG Xiaolin (State Grid Shanghai Jinshan Electric Power Supply Company, Shanghai 2Oo540,China)

Abstract: [Purposes] To address the issue of wind power fluctuations,we utilize the regulating capability of small hydropower to integrate wind farms,hydropower plants,and loads to construct a virtual power plant.[Methods] With the objective to minimize hydropower generation cost,wind curtailment cost,and network loss cost,this study investigates the construction scheme for small hydropower virtual power plants.Considering the actual watershed characteristics of small hydropower clusters,a cascade hydropower plant model is incorporated. Under the constraints of ensuring power flow secrurity and cascade hydropower operation,a constraint condition of "Power Ramp Rate Coefficient" is introduced to keep power changes within a certain range.Meanwhile,a regional grid case is analyzed and solved using MATLAB.[Findings] The comparison of the results shows that the power output of each hydropower unit has been optimally allocated,and the system power loss has decreased from 2.51 MW to O.022 MW. The cost of small hydropower generation has also decreased from 0.032 9 104 yuan to 0.022 3 104 yuan. [Conclusions] The feasibility and effectivenessof the virtual power plant construction scheme for regulating wind power fluctuations using small hydropower have been successfully verified.Byutilizing the regulating capability of small hydropower to improve the fluctuation of wind power output,the constructed virtual power plant can reduce the cost of hydropower generation,curtailment cost,and power loss,enhance operational stability of the grid,and improve economic performance.The proposed virtual power plant construction scheme and model are applicable in areas with abundant water resources. Keywords: small hydropower; virtual power plant; wind power fluctuations

0引言

分布式電源出力的不確定性、波動(dòng)性及發(fā)電技術(shù)不成熟,導(dǎo)致我國(guó)的風(fēng)電、光伏發(fā)電的棄風(fēng)、棄光率高,分布式電源發(fā)電量無(wú)法完全并網(wǎng)消納,棄風(fēng)、棄光損失大。(剩余9406字)

目錄
monitor