特黄三级爱爱视频|国产1区2区强奸|舌L子伦熟妇aV|日韩美腿激情一区|6月丁香综合久久|一级毛片免费试看|在线黄色电影免费|国产主播自拍一区|99精品热爱视频|亚洲黄色先锋一区

超高壓尾管回接壓裂工藝在塔里木盆地應用研究

  • 打印
  • 收藏
收藏成功


打開文本圖片集

中圖分類號:TE934文獻標識碼:ADOI:10.12473/CPM.202406052

Li Zhen,Zhang Changduo,Zhang Rui,et al.Application of ultra-high pressure liner tieback fracturing technology inTarimBasin[J].ChinaPetroleumMachinery,2025,53(5):133-138.

Application of Ultra-High Pressure Liner Tieback Fracturing Technology in Tarim Basin

Li Zhen 1,2 Zhang Changduo3Zhang Ru 1,2 Heng Xuanyi3Zheng Dujian 1,2 GuLei 1,2 (1.Sinopec Research Instituteof Petroleum Engineering Co.,Ltd.;2.Shelfoil Petroleum Equipment& Services Co.,ld.; 3. PetroChina Tarim Oilfield Company)

Abstract:The Silurian sandstone reservoirs in central Tarim Basin are characterized by poor physical properties,strong heterogeneity,lowporosity andlow permeabilityor ultra-low porosity and ultra-low permeability, which bring great chalenges to oilfield development.After analyzing the main technical challenges faced by the staged fracturing of horizontal wels in central Tarim Basin,an ultra-high pressure liner tieback fracturing,cementing and completion integrated string technology was proposed.The structure of the ultra-high pressre liner cementing and completion tool was designed,and simulation analysis and ground performance test were conducted on its bearing,anchoring and sealing capacities.The results show that the liner hanger has a bearing capacity up to 1 (204號 200kN , the tieback anchoring capacity is 1100kN , and the sealing capacity of the whole integrated string after tieback is 105MPa ,meeting the requirements for implementation of horizontal well staged fracturing technologies such as staged fracturing using coiled tubing with botom packer or bridge plug.The proposed technology was tested in 2 wells of Tazhong 16block ,demonstrating successful cementing and completion jobs, and the maximum fracturing pressure of 90MPa . The field test results show that the ultra-high pressure liner tieback fracturing, cementingand completion integrated string technology is qualified for stimulation of low porosityand lowpermeability reservoirs,and provides technical support for the eficient exploration and beneficial developmentof oil and gas in low porosity and low permeability reservoirs.

Keywords: staged fracturing;liner cementing;tieback anchoring;reservoir stimulation; tight oil and gas; Tarim Basin

0引言

塔里木盆地是中國最大的含油氣盆地,油氣資源豐富。(剩余8648字)

monitor