°</sup> ,表明該方法能夠有效提升造斜率預(yù)測精度,尤其在造斜率急劇變化的井段表現(xiàn)出更優(yōu)的預(yù)測性能。研究結(jié)果可為造斜率的準(zhǔn)確預(yù)測提供新的思路,同時也可為井眼軌跡的精確調(diào)控提供一定的技術(shù)支撐。-龍?jiān)雌诳W(wǎng)" />

特黄三级爱爱视频|国产1区2区强奸|舌L子伦熟妇aV|日韩美腿激情一区|6月丁香综合久久|一级毛片免费试看|在线黄色电影免费|国产主播自拍一区|99精品热爱视频|亚洲黄色先锋一区

機(jī)理-數(shù)據(jù)融合的造斜率智能預(yù)測方法

  • 打印
  • 收藏
收藏成功


打開文本圖片集

中圖分類號:TE243文獻(xiàn)標(biāo)識碼:ADOI:10.12473/CPM.202404089

Bai Jiashuai,Zhong Yinming,Wang Liwei,etal.Mechanism-data fused intelligent prediction of build-up rate[J].China Petroleum Machinery,2025,53(5):1-9.

Mechanism-Data Fused Intelligent Prediction of Build-Up Rate

Bai Jiashuai1Zhong Yinming1Wang LiweiLi Zhen2Song Xianzhi2Liu Zihao2Zhu Zhaopeng3 (1.OiProductionTechnology ResearchInstitute(Supervision Company),PetroChina XinjiangOileldompany;2.Collgeof PetroleumEngineering,China UniversityofPetroleu(Beijing);3.ColegeofMechanicalandTransportationEngineering,Chna U niversity of Petroleum (Beijing))

Abstract:The accurate prediction ofbuild-up rate is fundamental for wellbore trajectory control,and it directlyaffects thedrilling effciencyof directional wells.However,due to the complexityof downhole mechanical behaviors,traditional prediction methods cannot accurately predictthe build-uprate for their limitations.This paper presents a mechanical-intellgent model fused build-up rate prediction method.Specifically,the mechanical model isused tocalculate the bit side force,bit rotation angleand ultimate build-uprate as the main control factors,and the automated machine learning framework is combined with other parameters for purpose of fiting prediction,therebyavoiding theempirical coeficient inversion intraditional method.In this way,theadvantagesof accurate macroscopic pattern description of the mechanical model and strong nonlinear fiting abilityof the inteligent modelare fully exerted.The data from 14 wels inthe Mahu block of Xinjiang Oilfield were used for training and test.The results show that,with mechanical parameters fused,the model achieves the maximum error,root mean square error and average absolute error of build-up rate reduced by 17% , 12% and 8% ,respectively,with the root mean square error and average absolute error less than 1.00° per 30m ,indicating that this method can effectively improve theaccuracyof build-uprate prediction,and is more effectively performed especially in hole sections with sharp changes in build-up rate.This study provides a new idea for the acurate prediction of build-up rate, and also a technical support for the precise control of wellbore trajectory.

Keywords:intellgent driling;automated machine learning;build-up rate prediction;mechanism-data fused; mechanical parameter

0引言

造斜率的精確預(yù)測是實(shí)現(xiàn)井眼軌跡高質(zhì)量調(diào)控的基礎(chǔ),但由于造斜率的影響因素極為復(fù)雜,至今尚未完全厘清底部鉆具組合(BHA)在復(fù)雜地層中的造斜機(jī)理,所以精確預(yù)測仍具挑戰(zhàn)性。(剩余13253字)

monitor