考慮相鄰點(diǎn)影響的基坑沉降優(yōu)化組合預(yù)測(cè)分析

打開文本圖片集
關(guān)鍵詞:基坑;沉降變形;單項(xiàng)預(yù)測(cè)模型;優(yōu)化處理;組合預(yù)測(cè)
中圖分類號(hào):TU43 文獻(xiàn)標(biāo)志碼:A 文章編號(hào):1005-8249(2025)03-0122-06
DOI:10.19860/j.cnki.issn1005-8249.2025.03.022
Abstract:Inorder toachieve high-precision predictionoffoundation pitsetlementanddeformation,basedonthesummaryof theshortcomingsoftraditionalcombinationpredictionmodels,asinglepredictionmodelscreningisfirstcarriedout,andthe parametersofeach singlepredictionmodelareoptimized;Secondly,furtheroptimizationof nonlinearcombinationand distance between nodes,aswellasconsiderationofoptimizationofadjacent nodes,iscarriedout toachieveoptimizedcombination predictionoffoundation pitsetlement deformation.Exampleanalysis shows that:TheELMmodel,GM(1,1)model,and SVR model have goodcomplementarityandcan beusedas basic prediction models.Throughoptimized combination processing in thesetlement deformation prediction process,the averagerelative error of the predicted resultsranges from 1.56% to 1.65% ,with high predictionaccuracyand robustness.The prediction resultsarecompared with those of traditional models, andit isconcluded thatthepredictionmodelhasrelativelybeterpredictionaccuracy,whichverifiestheefectivenessof its construction ideaandissuitableforpredicting foundation pitsetlementdeformation.Throughresearch,weaimto provide theoretical guidance for the study of deformation laws in foundation pits.
Key Words:foundationpit;selement deformation;singlepredictionmodel;optimizationtreatment;combinationprediction
0 引言
基坑工程的復(fù)雜性強(qiáng)、施工難度較大,在其施工過(guò)程中,時(shí)有事故發(fā)生,如2015年7月,禪城區(qū)某工程基坑一側(cè)出現(xiàn)坍塌,雖未造成人員傷亡,但經(jīng)濟(jì)損失嚴(yán)重;2017年5月,深圳某基坑塌方事故,造成3死1傷,損失嚴(yán)重;如2024年6月,成都某基坑出現(xiàn)垮塌事故,造成了較大的經(jīng)濟(jì)損失[1]。(剩余6911字)