某海上漂浮式風(fēng)電項(xiàng)目地質(zhì)勘察方案探討

打開文本圖片集
DOI:10.3969/j.issn.1001-2206.2025.03.004
Geological exploration scheme of an offshore floating wind power project
LIUWei,WANG Yu,SHENHui,LUO Xiang,CAO Shugang,ZHOUQuanzhi Longyuan (Beijing)New Energy Engineering Design&Research InstituteCo.,Ltd.,Beijing 1Ooo34,China
Abstract:Anofshorefloatingwindpowerprojectisfacedwithproblemsofrelativelyshallowsiltatthesiteandcomplexengineing geologicalconditionsinthebedrockbenathInadditionasthisprojectisanofsorefoatingwindpowerplatforintegratedwith fisheries,thereisproblemthalargedesinloadattechorend.Fotseissues,theterrainandsiltdepthattencorntf themooringsstemaretakenintoconsideration.Then,byanalzingthegeologicalexloratioparameterrequirementsforsuctioahor design,thegeologicalconditiosanddifltiesintegeolgicalexploratiooftisproctareompreesivelysdied.Ontisbasis, ageological explorationschemeisproposed,includingtheunderwatershalowstrataprofileprobe,sidesaningsonardetection, piezoconepenetrationtest(PTU),andorolejitsureysuringtatthexploationsultsaeetheequiremetsfrject implementationhileectivelyreducingtheexplorationwokloadandperod.Folowingtheforulatedgeologcalexplorationhme the scheme enables efficient field exploration and successul suction anchor installation.
Keywords:ofshore wind power;ofshore wind power engineeringsurvey;geological explorationschemes;suction anchor; piezocone penetration test (CPTU)
由于海洋環(huán)境的特性,海上漂浮式風(fēng)電項(xiàng)目不僅要承受海洋多種環(huán)境荷載的持續(xù)作用,還要受到海底復(fù)雜地質(zhì)條件的影響,這使得錨泊系統(tǒng)的設(shè)計(jì)與安裝過程面臨較大挑戰(zhàn)與風(fēng)險(xiǎn)。(剩余7267字)