新建地鐵附屬結(jié)構(gòu)施工對既有地鐵結(jié)構(gòu)的影響研究
關(guān)鍵詞:地鐵附屬結(jié)構(gòu);既有地鐵;Midas-GTS;變形控制;運營安全
中圖分類號:U451;U231;TU753文獻標(biāo)志碼:A 文章編號:1003-5168(2025)13-0071-06
DOI:10.19968/j.cnki.hnkj.1003-5168.2025.13.014
Study on the Impact of New Metro Ancillary Structure Construction on Existing Operational Metro Structures
WANG Yuanliu1GE Xinhu'YI Lingbing1 ZHANG Peng2NI Hanjie2DENG Kangkang2 (1.Zhengzhou Urban Construction Vocational College, Zhengzhou 45oooo,China; 2.China Railway Tunnel Bureau Group (Shanghai) Special High-Tech Co.,Ltd., Shanghai 2013O6, China)
Abstract: [Purposes] Study the impact of constructing of new metro ancillarg structures on existing operatonal metro structures.[Methods] Taking a specific metro project as a case study,a three-dimensional numerical calculation model was established using the numerical simulation software Midas GTS to simulate the construction process of new entrances and connecting channels.The deformation patterns and stress variation in the existing metro structure caused by the construction of new metro entrances and connecting channels were analyzed.[Findings] During the construction of new metro ancillary facilities, the maximum vertical defor mation of the existing metro station structure and tunnel segment structure was 0.27mm and 0.03mm respectively,both below the vertical deformation control value of O.3 mm; during the construction process,the maximum horizontal deformation of the existing metrostation structure was 0.19mm ,and the maximum horizontal deformation of the existing tunnel segment structure was 0.04 mm;the maximum differential settlement in the track area reached 0.13mm at Deformation Joint No2. After the completion of construction,the maximum and minimum principal stresses of the existing metro station structure reduced by O.42 MPa and O.34 MPa respectively,and the maximum and minimum principal stresses of the tunnel segment structure reduced by O.O6 MPa and O.O1 MPa respectively. [Conclusions] The deformationand stress variations caused by construction are both below the limit values.The accuracy of the model was verified by comparing the numerical calculation results with the field monitoring data.The research results can provide reference for the design and construction of similar projects.
Keywords: metro accessory structures; existing metro; Midas-GTS; defor mation control; operational safety
0 引言
隨著我國城市化進程的加速,地鐵網(wǎng)絡(luò)逐步加密,新建地鐵線路與既有線路的空間交叉問題日益突出。(剩余5136字)
- 科技資訊...
- 鄭州與其他國家中心城市競爭力的...
- 變電站直流回路中防交流竄入的直...
- 高壓配電線路帶電作業(yè)數(shù)字化安全...
- FSMR50矢量信號分析儀的使...
- 600MW火電機組汽輪機回?zé)峒?..
- 基于液冷與相變材料的復(fù)合動力電...
- 一種一體化萵筍自動收獲機設(shè)計...
- YF716型包裝機組物料站自動...
- 基于數(shù)值模擬的切頂卸壓后保護煤...
- 礦井可視化系統(tǒng)融合設(shè)計中的云邊...
- 基于多傳感器的水利引水渠道動態(tài)...
- 某TBM隧洞收斂監(jiān)測分析及應(yīng)用...
- 基于近景數(shù)字?jǐn)z影測量的橡膠混凝...
- 新建地鐵附屬結(jié)構(gòu)施工對既有地鐵...
- 玄武巖纖維輕質(zhì)陶粒水泥混凝土性...
- 黃黏土路塹邊坡的滲流及穩(wěn)定性研...
- 鐵路工程簡支T梁不同運架方式施...
- Tm3+ 離子摻雜 BaSiO...
- 191S不飽和聚酯樹脂總酸值測...
- 自動激光焊接在鋰電池制造中的應(yīng)...
- 河南省新型城鎮(zhèn)化與生態(tài)環(huán)境耦合...
- 2018一2022年寧夏春季沙...
- 城市雨水地表徑流特征分析、管理...
- 新集二礦2401工作面灰?guī)r含水...
- 湖北省陽新縣木港鎮(zhèn)石溪村滑坡地...
- 短視頻平臺著作權(quán)侵權(quán)責(zé)任認(rèn)定的...
- 博物館商標(biāo)權(quán)保護:多重困境下的...
- “十四五”時期河南省商標(biāo)質(zhì)押融...
- 鄭州大型儀器共享平臺賦能區(qū)域協(xié)...
- 應(yīng)用型高校智慧學(xué)習(xí)社區(qū)建設(shè)策略...
- 河南省新型研發(fā)機構(gòu)成長性現(xiàn)狀與...