BIM技術(shù)在導(dǎo)截流工程中的應(yīng)用研究
摘 要:該文研究建筑信息模型(BIM)技術(shù)在水利水電導(dǎo)截流工程中的應(yīng)用。通過(guò)對(duì)BIM技術(shù)的理論分析和實(shí)際案例研究,探討水利水電導(dǎo)截流工程中BIM技術(shù)在提高工程設(shè)計(jì)效率、優(yōu)化施工方案、降低工程風(fēng)險(xiǎn)等方面的積極作用,可為相關(guān)工程實(shí)踐提供參考和借鑒。
關(guān)鍵詞:BIM技術(shù);導(dǎo)截流;工程設(shè)計(jì);施工方案優(yōu)化;案例研究
中圖分類(lèi)號(hào):TV522 文獻(xiàn)標(biāo)志碼:A 文章編號(hào):2095-2945(2024)23-0193-04
Abstract: This paper studies the application of Building Information Model(BIM) technology in water conservancy and hydropower diversion and closure projects. Through the theoretical analysis and practical case study of BIM technology, this paper discusses the positive role of BIM technology in improving engineering design efficiency, optimizing construction scheme and reducing project risk in water conservancy and hydropower diversion and closure projects, which can provide reference for related engineering practice.
Keywords: BIM technology; diversion and closure; engineering design; construction scheme optimization; case study
在全球水利水電工程建設(shè)的持續(xù)進(jìn)步與演變中,導(dǎo)截流工程不僅是其不可或缺的組成部分,更是確保整個(gè)工程順利推進(jìn)的關(guān)鍵環(huán)節(jié)。(剩余6549字)