特黄三级爱爱视频|国产1区2区强奸|舌L子伦熟妇aV|日韩美腿激情一区|6月丁香综合久久|一级毛片免费试看|在线黄色电影免费|国产主播自拍一区|99精品热爱视频|亚洲黄色先锋一区

運(yùn)營(yíng)隧道管片錯(cuò)臺(tái)數(shù)據(jù)統(tǒng)計(jì)及規(guī)律分析

  • 打印
  • 收藏
收藏成功


打開文本圖片集

摘  要:該文依托杭州某鄰近運(yùn)營(yíng)地鐵隧道的基樁施工工程,對(duì)鄰近樁基施工后管片錯(cuò)臺(tái)進(jìn)行分析,得到結(jié)果為施工后左右線隧道管片腰部的錯(cuò)臺(tái)量較大。鄰近樁基施工對(duì)附近錯(cuò)臺(tái)量較大的管片有抑制其繼續(xù)擴(kuò)大的趨勢(shì),而對(duì)于錯(cuò)臺(tái)量較小或者無(wú)錯(cuò)臺(tái)的管片則會(huì)影響其發(fā)生錯(cuò)臺(tái)。

關(guān)鍵詞:運(yùn)營(yíng)隧道;隧道管片;錯(cuò)臺(tái)量;樁基施工;水平位移

中圖分類號(hào):TU997       文獻(xiàn)標(biāo)志碼:A          文章編號(hào):2095-2945(2023)19-0092-05

Abstract: In this paper, based on the foundation pile construction project of a nearby subway tunnel in Hangzhou, the faulting of slab ends of the segment after the construction of the adjacent pile foundation is analyzed, and the results are as follows: There is a large amount of faulting of slab ends at the waist of the tunnel segment on the left and right lines after construction. The construction of adjacent pile foundation has a tendency to restrain the expansion of the segment with a large number of faults nearby, while the segment with less or no fault will affect the occurrence of the fault.

Keywords: operating tunnel; tunnel segment; number of faulting of slab endss; pile foundation construction; horizontal displacement

隨著國(guó)內(nèi)外地鐵盾構(gòu)隧道的大量建設(shè)和運(yùn)營(yíng),盾構(gòu)隧道縱向變形問(wèn)題逐漸凸現(xiàn),嚴(yán)重影響著隧道結(jié)構(gòu)的安全[1-3]。(剩余4885字)

目錄
monitor