1</sub>,r<sub>2</sub>) 和隧道軸心間距 D 等3種主要影響因素,建立雙線平行盾構隧道任意布置方式下施工引起的地表沉降預測模型,通過實際工程的現(xiàn)場監(jiān)測結果和數(shù)值模擬結果驗證預測模型的工程適用性,并對雙線平行盾構隧道任意布置方式下施工引起地表沉降的主要影響因素進行分析。結果表明:預測模型可用于解決雙線平行盾構隧道任意布置方式下施工引起的地表沉降問題,且滿足 20% 的工程精度要求;地表沉降曲線從“V”形至“W"形間變化的臨界參數(shù)值 [α,r<sub>2</sub>/r<sub>1</sub> D/H<sup>′</sup> 為 [60<sup>°</sup> ,2.0,1.O],可據(jù)此初步判斷地表沉降曲線形狀并檢驗地表沉降計算結果的合理性,為類似隧道工程建設中的地表沉降變形預測及控制提供參考。-龍源期刊網(wǎng)" />

特黄三级爱爱视频|国产1区2区强奸|舌L子伦熟妇aV|日韩美腿激情一区|6月丁香综合久久|一级毛片免费试看|在线黄色电影免费|国产主播自拍一区|99精品热爱视频|亚洲黄色先锋一区

雙線平行盾構隧道任意布置方式下施工引起的地表沉降預測模型

  • 打印
  • 收藏
收藏成功


打開文本圖片集

中圖分類號:U455.43 文獻標志碼:A 文章編號:2096-6717(2025)03-0113-13

Prediction model of ground settlement caused by construction of double track parallel shield tunnels under arbitrary layout

WANG Chao, ZOU Jinfeng (Schoolof Civil Engineering,Central South University,Changsha 4lOO75,P.R.China)

Abstract: In order to investigate the surface settlement patern caused by construction of a twin parallel shield tunnels in an arbitrary arrangement,a relevant theoretical prediction model needs to be established. Considering the effects of ground soil loss rate and convergence pattrn,the classical two-dimensional Peck model is improved by introducing equivalent soil loss parameters to find the actual burial depth after tunnel convergence, taking circular tunnelas an example.Based on this,a prediction model for surface settlement due to construction of the twin parallel shield tunnels in any arangement is established by considering three main influencing factors, including the angle α between the tunnel axis and the horizontal plane, the radius of the two-lane tunnel (r1,r2) and the tunnel axis distance D . The applicability of the proposed model is verified by the field monitoring and numerical simulation results from engineering practice,and predictive model for surface setlement due to construction of the twin paralel shield tunnels in any arangement is established.The main influencing factors of surface setlement caused by construction under arbitrary arrangement of the twin parallel shield tunnels are analyzed.The results show that the prediction model could be used to solve the surface setlement problem caused by the construction of a two-line paralel shield tunnel in any arrangement,and it meets the engineering accuracy requirement of 20% . The critical parameter values [α,r2/r1,D/H′] for the variation of the surface settlement curve from "V" to "W" are [60°,2.0,1.0] ,which can be used to make a preliminary judgment on the shape of the surface setlement curve and check the rationality of the surface settlement results.It provides reliable guidance for prediction and control of surface settlement deformation in similar tunnel construction.

Keywords: twin parallel shield tunnel; layout mode; surface settement;prediction model

隨著盾構施工水平不斷提升,越來越多的城市軌道交通工程采用盾構法施工。(剩余18965字)