特黄三级爱爱视频|国产1区2区强奸|舌L子伦熟妇aV|日韩美腿激情一区|6月丁香综合久久|一级毛片免费试看|在线黄色电影免费|国产主播自拍一区|99精品热爱视频|亚洲黄色先锋一区

基于三維離散元的巖爆突變點(diǎn)處動(dòng)力行為與能量演化研究

  • 打印
  • 收藏
收藏成功


打開文本圖片集

中圖分類號(hào):TU457 文獻(xiàn)標(biāo)志碼:A 文章編號(hào):2096-6717(2025)03-0102-11

Dynamic behavior and energy evolution at rockburst mutation momentbasedon DEM

WEI Ruia, ZHAO Chengab,QIAN Yuana (a.College ofCivil Engineering;b.KeyLaboratoryofGeotechnical and Underground EngineeringofMinistryof Education,Tongji University,Shanghai 2Ooo92,P.R.China)

Abstract:The dynamic behavior and energy evolution of rockburst at the moment of sudden instabilityare the key to reveal rockburst formation mechanism.Based on the instability theory and stifness theory,a combination model consists of rockburst body and its surrounding rock was established using the three-dimension discrete element method (DEM). With it the energy evolution process of the system is visualized through secondary development and the ejection phenomenon of rockburst is simulated successfully.Based on the numerical simulation,the tempo characteristics and energy evolution patterns of instability of the system are studied. The results show that the rockburst rock body reaches the peak stress slightly earlier than the surrounding rock body. The rupture and softening of the rockburst body after the peak stress results in the unloading of the surrounding rock body,and causes its stress change from increases to decreases.The surrounding rock mass then has a rapid rebound deformation to the rockburst body,and the elastic energy stored in the surounding rock body converges to the rockburst body.In this process,the positive feedback regulation mechanism formed by the interaction of the two subsystems accelerates the fracture process and finaly leads to dynamic instability. The research results can provide theoretical reference and technical support for further revealing the rockburst mechanism.

Keywords: rockburst; mutation moment; dynamic behavior; energy evolution; discrete element method

近年來,在“向地球深部進(jìn)軍”科技戰(zhàn)略的指導(dǎo)下,深埋地下工程建設(shè)步入了新的高峰期。(剩余19263字)

monitor