Steel Quantity Control of Steel Shell Immersed Tube of Shenzhen-Zhongshan Cross-River Channel
LIU Ya, GUO Wenzhong, PAN Junfa, HE Maohua
(CSSC Guangzhou Huangpu Wenchong Shipbuilding Co.,Ltd,Guangzhou 511462)
Abstract: Shenzhen-Zhongshan cross-river channel immersed tube tunnel is a large-scale steel structure project, the steel quantity of the project directly affects the construction cost of the project, and the steel quantity control is the top priority of the design management. This paper mainly studies the material quantity control method and applies it to steel quantity management of the project, in order to achieve sustainable and high-quality steel management, maximize the utilization rate of steel and reduce the steel procurement cost。(剩余3175字)