打開文本圖片集

摘    要:海上風(fēng)電場三筒吸力樁導(dǎo)管架,可分為過渡段、導(dǎo)管支架、吸力樁三大部分。本文探討了這三部分和總組的建造工藝流程以及建造過程中的精度控制要點,為類似項目提供參考。

關(guān)鍵詞:三筒吸力樁導(dǎo)管架;建造工藝;精度控制

中圖分類號:TH162                                  文獻(xiàn)標(biāo)識碼:A

Construction Technology and Precision Control

of Three-Cylinder (Suction Pile) Jacket

ZHANG Ling1,  LI jin2

( 1. CMHI ( JS ) , Nantong  226116;  2.Jiangsu Shipping College, Nantong 226010 )

Abstract: Based on the fact that the three-cylinder (suction pile) jacket of offshore wind farm is divided into three major parts: ITD, Pipe support and suction pile. This paper discusses the construction process of these three parts and the erection work and the key points of progress control in the construction process. It can provide reference for subsequent similar projects.

Key words: Three Cylinder (Suction Pile) Jacket; Construction Technology; Precision Control

1     前言

海上風(fēng)電是可再生能源開發(fā)的重要領(lǐng)域,是戰(zhàn)略性新興產(chǎn)業(yè)的重要組成部分。(剩余4487字)