蓋挖逆作法基坑生產(chǎn)性抽水試驗(yàn)施工工藝探討

打開(kāi)文本圖片集
【摘 要】:蓋挖逆作法施工的基坑在頂板施工并覆土完成后,需要進(jìn)行生產(chǎn)性抽水試驗(yàn),以地鐵項(xiàng)目為例,采用降水井內(nèi)預(yù)置的振弦式孔隙水壓計(jì)的施工工藝,從而換算出坑內(nèi)降水井水位變化情況,以保證生產(chǎn)性抽水試驗(yàn)的順利進(jìn)行。
【關(guān)鍵詞】:蓋挖逆作法;抽水試驗(yàn);基坑降水;振弦式孔隙水壓計(jì);地鐵
【中圖分類號(hào)】:U231.3 【文獻(xiàn)標(biāo)志碼】:C 【文章編號(hào)】:1008-3197(2024)04-26-03
【DOI編碼】:10.3969/j.issn.1008-3197.2024.04.006
Discussion on the Construction Technology of Production Pumping Test for
Foundation Pit by Inverted Construction Method
LI Guoyao,MA Tao,WANG Jing
(Shanghai Changkai Geotechnical Engineering Co. Ltd.,Shanghai 200093,China)
【Abstract】:For the basement excavated by the inverted construction method, after the top slab is completed and the soil is covered, a production water test is required. Using a subway project as an example,the construction process involves placing a piezoelectric porosity water pressure gauge in the well to calculate the water level change in the well, thereby ensuring the successful completion of the production water test.
【Key words】:inverted construction method;water test;foundation pit dewatering; piezoelectric porosity water pressure gauge;subway
蓋挖逆作法是現(xiàn)階段地鐵施工中比較常用一種方法,不但可以實(shí)現(xiàn)對(duì)地下空間的最大化使用,還可以盡早恢復(fù)交通通行,避免對(duì)路面上的交通造成嚴(yán)重的影響[1]。(剩余3029字)