特黄三级爱爱视频|国产1区2区强奸|舌L子伦熟妇aV|日韩美腿激情一区|6月丁香综合久久|一级毛片免费试看|在线黄色电影免费|国产主播自拍一区|99精品热爱视频|亚洲黄色先锋一区

冰水沉積層隧道超前帷幕注漿施工技術(shù)應(yīng)用探討

  • 打印
  • 收藏
收藏成功


打開文本圖片集

摘  要:超前帷幕注漿堵水是隧道過富水圍巖安全施工保證的重要手段。該文以川藏鐵路某隧道過冰水沉積層段為例,詳細介紹超前帷幕注漿堵水施工的整體施工方法和具體操作,對注漿效果進行簡單評價?;诖?,提出針對超前帷幕注漿施工技術(shù)的個人見解,以便為類似工程施工提供一定的借鑒和成功經(jīng)驗。

關(guān)鍵詞:隧道;冰水沉積層;超前帷幕注漿;堵水;鐵路施工

中圖分類號:U455      文獻標(biāo)志碼:A          文章編號:2095-2945(2023)10-0164-04

Abstract: Water plugging by advanced curtain grouting is an important means to ensure the safe construction of water-rich surrounding rock of the tunnel. Taking the ice-water deposition section of a tunnel of Sichuan-Tibet Railway as an example, this paper introduces in detail the overall construction method and concrete operation of leading curtain grouting water plugging construction, and simply evaluates the grouting effect. Thus, some suggestions on the construction technology of advanced curtain grouting are put forward, in order to provide some reference and successful experience for the construction of similar projects.

Keywords: tunnel; ice-water deposit; advanced curtain grouting; water plugging; railway construction

隧道作為鐵路網(wǎng)施工中主體結(jié)構(gòu)之一,對縮短線路距離、改善運行條件等都具有突出作用。(剩余5035字)

目錄
monitor